![]() |
||||||||
![]() |
||||||||
![]() |
||||||||
We have a narrow gauge Climax pulling two narrow gauge cars (Backwoods Log Train). The idler flat car is next which is a dual gauge coupler car. The other end of the flat are two standard gauge cars (Backwoods Work Train). | ||||||||
![]() |
||||||||
This idler flat car is used to connect narrow gauge equipment to standard gauge when they are both on the dual gauge track. | ||||||||
![]() |
||||||||
![]() |
||||||||
![]() |
![]() |
|||||||
![]() |
||||||||
![]() |
||||||||
![]() |
||||||||
![]() |
||||||||